Module

Sourcing & RFQ

Quotes side by side with the landed cost, the lead time and the supplier's record beside each — and the award with its reason kept.

Running in production₹10,000 / month
See pricing

What it produces

  • An RFQ raised from a requisition or for any material, with the required date and the quote deadline
  • Every quote compared: landed unit cost (price + freight + duty), lead time against the required date, MOQ, validity
  • Against the last price paid and against each other, with the supplier's OTIF, rejects, risk band and contract beside it
  • The lowest feasible landed cost named as the recommendation — never awarded automatically
  • The award as a named person's act with the reason, audited, raising the draft purchase order in one step

A worked example

RFQ-00014 Resin 12 t — 3 quotes, recommended Resin Ltd at 118.40 landed, saves 31,200 vs last paid
Resin Ltd 112 + 4 freight + 2% duty = 118.40 · 18 d lead, 9 d slack · OTIF 94% · contract SC-2024-011
Polymer Co 109 + 6 freight + 2% duty = 117.30 · lead time 35 d misses the required date by 8 days
Chem Traders 121 · quote expired 2026-08-30 · rejects 4.1% on past receipts
awarded to Resin Ltd by P. Nair — recommended; PO-RFQ-00003 raised

Illustrative figures. On your tenant the same page shows yours.

Why it is hard

The part that is not a report.

A buyer compares three quotes in a spreadsheet, picks one, and the reason is gone by the next audit. This holds the RFQ and the quotes, does the arithmetic — price plus freight plus duty, lead time against the date the plant needs it, the last price paid — puts the supplier's delivery and quality record beside each, and records the award as a person's act with its reason.

Opened by the procurement lead, the supply chain manager and the planner — what each of them sees first.

Said before you ask

What is not finished.

Quotes are recorded as received (imported or typed), and the comparison is arithmetic over them; no rate between currencies is assumed, so mixed-currency events compare within each currency only. Sending the RFQ to suppliers and a supplier portal are not in this release.

Where this sits

One of 23 modules, on one engine.

Sourcing & RFQ reads the same reconciled data as everything else SIAARU runs — connected read-only to your ERP, scored on the way in, measured in SQL. How that engine works is a page of its own. The other 22 modules, each with the state it is really in and the reason where it is not switched on, are on the module list; what this one costs, and what it costs beside the rest, is on the pricing page.

Get started

Bring one month of data. Leave with your own control tower.

A demo runs on your material master, your purchase orders and your stock — not on ours. Thirty minutes, and you see your own exceptions rather than a scripted one.

Ask a question

Book a demo

Thirty minutes, on your own data. Six fields — the rest only helps us prepare.

Not binding. Tell us the size and we will say which one fits.

The demo connects to it, so this shapes the whole session.

Add context, and the demo runs on your problem rather than a scripted one

We reply within one working day.