Diese Seite ist noch nicht auf Deutsch verfügbar, der Text unten ist daher auf Englisch. Menü, Formular und Demo-Buchung sind auf Deutsch — und die Demo kann auf Deutsch stattfinden.

Solutions

Four people open it. They open it for different reasons.

A control tower that shows everyone the same screen gets used by nobody. These are the four jobs SIAARU is actually opened to do, and what each one sees first.

By role

What lands on each desk.

The planner

"What will I run out of, and when?"

A demand forecast per material with its accuracy stated against a benchmark, days of cover against lead time, and the materials whose cover is shorter than their replenishment.

at-risk materials ranked by days short
each with forecast · cover · lead time · supplier

Procurement

"Which suppliers are quietly slipping?"

On-time performance by supplier and by site, quality rejection rates, and price drift against contract — with the purchase orders behind each figure one click away.

supplier scorecard on-time · quality · price variance
drawn from your PO and receipt history

Logistics

"What is late, and what does late cost?"

Shipments against their original ETA rather than their most recently revised one — the revision is where a delay hides. Freight cost per tonne by lane, and the shipments blocking a production order.

delay measured against the promise, not the latest ETA
milestones imported, from your TMS, or live (in progress)

Finance

"Where is the working capital sitting?"

Days inventory outstanding, inventory turns, and the value of stock that has not moved — each convertible to your base currency on a recorded rate, so a figure can be re-derived at audit.

DIO avg inventory ÷ COGS × 365
slow-moving value · age · last movement

By situation

Three ways this usually starts.

You have SAP and still run on spreadsheets

The data is in the ERP; getting a usable view out of it takes a person three days a month. SIAARU reads the same tables and produces the view continuously, with the formula attached so nobody has to trust it blind.

You have several plants and no single number

Each site measures fill rate slightly differently, so the group number is an average of four definitions. One engine, one definition, per-site breakdowns underneath it.

You are about to be audited

Every state change carries actor, before, after and reason. Every KPI can be re-derived from the rows it was computed from. That is the same property an auditor asks for and a planner needs.

Being straight about fit

When SIAARU is the wrong tool.

  • You need the system to place orders automatically. SIAARU recommends and routes for approval; it does not write back into your ERP.
  • You have under a few hundred SKUs and one site. A well-kept spreadsheet is genuinely cheaper, and we would rather say so now.
  • You want a forecast with no history to learn from. Under about a year of monthly data, the honest output is a benchmark forecast marked unvalidated — which we will show you rather than dress up.
  • You need a certified SOC 2 report today. We are not there yet. The current position, in full.

Loslegen

Bringen Sie die Daten eines Monats mit. Gehen Sie mit Ihrem eigenen Kontrollturm.

Die Demo läuft auf Ihrem material master, Ihren purchase orders und Ihrem Bestand — nicht auf unserem. Dreißig Minuten, und Sie sehen Ihre eigenen exceptions statt eines Drehbuchs.

Frage stellen

Demo buchen

Dreißig Minuten, mit Ihren eigenen Daten. Sechs Felder — der Rest hilft uns nur bei der Vorbereitung.

Unverbindlich. Nennen Sie uns die Größe, und wir sagen Ihnen, welches passt.

Die Demo verbindet sich damit, das prägt die ganze Sitzung.

Etwas Kontext, und die Demo läuft auf Ihrem Problem statt auf einem Drehbuch

Wir antworten innerhalb eines Werktages.