本页尚无中文版本,因此下方正文为英文。菜单、表单和演示预约均为中文,演示也可以用中文进行。

Solutions

Four people open it. They open it for different reasons.

A control tower that shows everyone the same screen gets used by nobody. These are the four jobs SIAARU is actually opened to do, and what each one sees first.

By role

What lands on each desk.

The planner

"What will I run out of, and when?"

A demand forecast per material with its accuracy stated against a benchmark, days of cover against lead time, and the materials whose cover is shorter than their replenishment.

at-risk materials ranked by days short
each with forecast · cover · lead time · supplier

Procurement

"Which suppliers are quietly slipping?"

On-time performance by supplier and by site, quality rejection rates, and price drift against contract — with the purchase orders behind each figure one click away.

supplier scorecard on-time · quality · price variance
drawn from your PO and receipt history

Logistics

"What is late, and what does late cost?"

Shipments against their original ETA rather than their most recently revised one — the revision is where a delay hides. Freight cost per tonne by lane, and the shipments blocking a production order.

delay measured against the promise, not the latest ETA
milestones imported, from your TMS, or live (in progress)

Finance

"Where is the working capital sitting?"

Days inventory outstanding, inventory turns, and the value of stock that has not moved — each convertible to your base currency on a recorded rate, so a figure can be re-derived at audit.

DIO avg inventory ÷ COGS × 365
slow-moving value · age · last movement

By situation

Three ways this usually starts.

You have SAP and still run on spreadsheets

The data is in the ERP; getting a usable view out of it takes a person three days a month. SIAARU reads the same tables and produces the view continuously, with the formula attached so nobody has to trust it blind.

You have several plants and no single number

Each site measures fill rate slightly differently, so the group number is an average of four definitions. One engine, one definition, per-site breakdowns underneath it.

You are about to be audited

Every state change carries actor, before, after and reason. Every KPI can be re-derived from the rows it was computed from. That is the same property an auditor asks for and a planner needs.

Being straight about fit

When SIAARU is the wrong tool.

  • You need the system to place orders automatically. SIAARU recommends and routes for approval; it does not write back into your ERP.
  • You have under a few hundred SKUs and one site. A well-kept spreadsheet is genuinely cheaper, and we would rather say so now.
  • You want a forecast with no history to learn from. Under about a year of monthly data, the honest output is a benchmark forecast marked unvalidated — which we will show you rather than dress up.
  • You need a certified SOC 2 report today. We are not there yet. The current position, in full.

开始使用

带一个月的数据来,带走属于你自己的控制塔。

演示跑在贵司的物料主数据、采购订单和库存上,而不是我们的样本。三十分钟,你看到的是自己的异常,而不是排练好的案例。

咨询

预约演示

三十分钟,跑在你自己的数据上。六个必填项——其余只是帮助我们做准备。

不构成承诺。告诉我们规模,我们来说哪一个合适。

演示会连接到它,因此这决定了整场会谈的内容。

补充背景,演示就跑在你的问题上,而不是排练好的案例

我们会在一个工作日内回复。