Module
Quality
Every batch judged against its specification, released by a named person, and certified from the results.
What it produces
- Inspection plans per material from the spec sheet: characteristic, method, specification, critical or not
- Every batch in quarantine, judged against its plan — conforms, out of specification, or incomplete with the missing tests named
- Release, hold or reject by a named person, audited; releasing against the judgement needs a written deviation
- The Certificate of Analysis from the results, only for a released batch
- Nonconformances with containment, root cause, corrective and preventive action, walked step by step and aged
- Labels refuse a rejected batch and mark a quarantined one
A worked example
B2609 Process Cyan — CONFORMS, released by R. Mehta, CoA issued
VISC 13.2 mPa·s against 12.0 – 14.0 · DENS 1.062 g/cm³ against 1.04 – 1.08 · PH 8.6 against 8.0 – 9.0
B2610: INCOMPLETE — GRIND not measured; release refused without a deviation
NCR-000014 MAJOR, in-process, 9 days open, due in 5 — root cause written, action pending
first-pass yield 91.7% (22 conforming ÷ 24 judged)
Illustrative figures. On your tenant the same page shows yours.
Why it is hard
The part that is not a report.
A customer's auditor asks three questions: what did you test this batch for, who released it, and where is the certificate. A quality system that lives in a spreadsheet answers them slowly and sometimes differently each time. This one holds the specification per material, judges each batch against it without ever guessing a missing result, records the release as a person's act, and prints the certificate from the same numbers.
Opened by the supply chain manager, the procurement lead and the planner — what each of them sees first.
Said before you ask
What is not finished.
The judging engine, the release act, the certificate and the NCR machine are built and tested. Three things a plant should know. The engine judges only what was measured — a missing test makes the batch incomplete, never a pass. Release is a person's act with a name and time on it, and releasing against the judgement needs a written deviation the certificate prints. And there is no sampling, SPC or instrument calibration here: the plan states the method and the lab states the result.
Where this sits
One of 23 modules, on one engine.
Quality reads the same reconciled data as everything else SIAARU runs — connected read-only to your ERP, scored on the way in, measured in SQL. How that engine works is a page of its own. The other 22 modules, each with the state it is really in and the reason where it is not switched on, are on the module list; what this one costs, and what it costs beside the rest, is on the pricing page.